Back to the site

Risk Management: Concepts and Practice · Part B: Credit Risk

Chapter 7: Measuring credit risk

The three numbers behind every loan’s risk, the loss they imply, and whether the loan earns enough for the capital it uses.

Open Chapter 7 in the e-bookThe book and its prices

Buyers of the e-book, or of the print copy, which includes it, read the whole chapter. Everyone can read the free sample, pages 1 to 24 of the e-book.

About this chapter

Why it matters

PD, LGD and EAD are the language of modern credit: of provisions under expected credit loss (from April 2027), of IRB capital, and of pricing.

In the exam

Expect short sums: EL, EAD with a CCF, workout LGD, implied PD, UL, RAROC and EVA. Watch the decimals.

At the desk: The pricing desk, Bank N, Mumbai

Narmada Cables wants its cash credit renewed at the same rate, 10.5%. Its relationship manager says the account is profitable. The credit risk team must say whether it is profitable enough: after the losses it will cause on average, and for the capital it ties up.

Ms Menon’s analyst has the bank’s estimates. She needs four numbers: the exposure at default, the expected loss, the RAROC, and the value the facility adds.

In this chapter

Corrections and updates

None for this chapter so far. Every correction to the book, and any rule that changes after its date, is listed on the errata page.